BL Companies is proud to be part of an Electric Vehicle Supply Equipment (EVSE) installation project at three locations in California: North Palm Springs, Santa Maria, and Fremont. Our team is providing architectural, engineering, and construction services to integrate Level 2 and Level 3 DC fast chargers to support the expansion of an electric vehicle fleet.
The project includes designing high-speed charging stations, futureproofing the sites with provisions for portable 1MW generator connections, and maintaining operational continuity throughout construction. This infrastructure upgrade supports long-term sustainability goals and a shift toward cleaner transportation solutions in these communities.
By collaborating with local utilities and construction teams, we’re making it possiBLe to deliver a smooth and efficient installation at all three locations. This project represents a growing nationwide effort to enhance EV infrastructure and reduce transportation-related emissions. Stay tuned for more updates!